ViveEV Logo

Contact us

Blog
Dive into our blog for in-depth insights, industry trends, and innovations in EV charging. Stay inspired with the latest updates shaping the future of e-mobility.

November 09, 2026

The 97% Uptime Standard and New Data Reporting Rules: What CPOs Need to Know

The 97% Uptime Standard and New Data Reporting Rules: What CPOs Need to Know

California has turned charger reliability into a rule. The California Energy Commission's (CEC) EV Charger Data and Reliability Standards took effect on April 1, 2026. Since September 28, new publicly funded fast chargers that are networked must also be OCPP 2.0.1 certified and report uptime every hour.

For Charge Point Operators (CPOs), this changes who measures reliability. It's no longer only your own dashboard. The state collects the numbers, can publish rankings, and can use them when it decides who gets future funding. The first reports are due January 31, 2027.

What the Rule Requires

The rule applies to DC fast chargers installed on or after January 1, 2024 that received public funding. That includes state grants, federal money passed through a state agency, and utility programs paid for by electricity customers ("ratepayers"). Chargers that serve only a company's own fleet are not covered. Each covered charger must follow the rule for six years from the day it was installed.

  1. Every port must work 97% of the time. Uptime is counted for each plug, not for the whole site. A port counts as "up" only when it's online, available and actually delivering power. Some outages don't count against the operator, such as grid power loss, natural disasters, vandalism (up to 10 days) and planned maintenance (up to 72 hours a year).

  2. Operators must report uptime to the state. Chargers installed by September 27, 2026 send a report twice a year, and they must record their status every 15 minutes and keep that data. Network-connected chargers installed after that date send their data every hour.

  3. New chargers must be OCPP 2.0.1 certified. OCPP is the common language a charger uses to talk to the software that manages it. From September 28, 2026, new fast chargers must be certified for version 2.0.1, which is the version California uses for hourly reporting.

Not Just a California Rule

The 97% bar isn't new. Federal NEVI rules already require more than 97% average annual uptime per port, and they require OCPP 2.0.1. Several states already write 97% into their own programs. What California adds is hourly reporting straight to the state. It's also funding a place to test whether equipment works together.

Other states could follow with similar reporting rules, so getting ready now is cheaper than catching up later.

A Short Readiness Check for CPOs

  1. Hardware. Check that every charger model you plan to install is on OCA's list as OCPP 2.0.1 certified, with the firmware version you'll actually ship. Before you push a firmware update later, ask your vendor whether the new version is still covered.

  2. Software. Ask your network provider whether its CSMS is OCA certified and enrolled with the CEC, or when it will be.

  3. Data. Make sure you can produce uptime per port, not per site. Check each port's rolling 12-month uptime every month, so weak ports show up while there's still time to fix them. For chargers installed before September 28, confirm that 15-minute interval data is being recorded and kept.

  4. Exclusions. Keep records for outages that may not count against you, such as utility outages, vandalism and planned maintenance. Planned maintenance is excluded only up to 72 hours per port per year, so fit firmware updates and service visits inside that allowance, at quiet hours.

  5. The site. Post a clear way for drivers to report outages. The rule requires it at every regulated fast-charging site.

  6. The calendar. The first semiannual report covers July 1 to December 31, 2026 and is due January 31, 2027. Review your numbers before you submit, since the CEC has a formal process for disputing published figures.